greenmetrics.ai
LISBON · 23 MAY 2023SUCCESS CASE

Baixa flooding anticipated through underground runoff observation

Over 60 minutes, 16 mm of rain fell on central Lisbon — about 27% of the full May historical average, per IPMA. greenmetrics.ai radar sensors detected the abrupt underground level change minutes before it emerged at street level.

All success cases
Baixa flooding anticipated through underground runoff observation
Rainfall
16 mm in 1h
Level jump
23 → 216 cm
Lead time
5 minutes
01TIMELINE

How it unfolded

  1. 16:50

    Rainfall onset. IPMA records 16 mm in one hour — 27% of the full May average.

  2. 17:25

    Radar sensor inside the Av. Almirante Reis drainage conduit records a baseline of 23 cm.

  3. 17:55

    The same radar detects a 10× rise to 216 cm within 30 minutes — an unambiguous signature of critical overflow upstream.

  4. 17:59

    greenmetrics.ai fires an alert to the downstream sensor location at Martim Moniz. Civil protection is notified. Water arrives at street level ~5 minutes later.

  5. 18:04

    Ground truth confirmed: flooding visible at Martim Moniz, exactly where the alert predicted.

02OUTCOME

Why it matters

This event is the canonical proof of greenmetrics.ai's anticipatory detection capability: a subterranean radar reading converted into actionable surface warning before citizens, traffic, or emergency crews were affected. The sensors are currently being densified to push the lead time from 5 to 15+ minutes.

03NEXT STEP

GET A FLOOD-RISK ASSESSMENT FOR YOUR CITY

Tell us about your city — we'll send back a 1-page readiness brief and schedule a technical call.